The Orchard Michalovce Residence

  • Investor
    MTB Investments, s.r.o., Bonpri, s.r.o.
  • Locality
    Michalovce
  • End date
    1st stage - 6 houses in the state of "rough construction", r. 2019/2020, 2nd stage -7 home to the state of "holodoms" 3 / 2021-11 / 2021
Construction description:

Brick-walled building 300 mm Porotherm Profi brick with mineral wool insulation 150 mm. Silicone-plaster facade.

Interior lime-cement plaster on walls and ceilings. 3-layer plastic windows, aluminum entrance and terrace doors. Gas-condensing boiler heating, underfloor heating on the ground floor, radiators on the first floor. Modern and practical disposition with a large social facility + 2x WC, 3x spacious bedroom with own closet. Modern interior solution of the ground floor with an open disposition of kitchen – dining area – hall, which is visually separated by a special staircase. Passability through the family house from the garden through the hall and also the technical room /laundry/. Spacious terrace behind the house. Modern architecture, high technical standard and high-quality materials.